Consulting
Stop paying for the same failure twice.
Most consultants have never had a failed winding on their bench. We take motors apart for a living, so our advice starts from evidence: insulation readings, bearing fits, contamination, and the probable cause written down.
PRACTICE 01 · FLAGSHIP
Root cause failure analysis
When a critical motor or gearbox fails, we tear it down, photograph every stage, measure fits against tolerance, and tell you why it died: application, installation, power quality, lubrication, or age.
- Written failure report with photos
- Probable cause and contributing factors
- Corrective actions ranked by cost
PRACTICE 02
Predictive maintenance programs
Route-based vibration, insulation resistance trending, thermal checks, gearbox oil sampling, and drive fault-log reviews on the equipment that matters most, so you hear about the next failure weeks early.
- Criticality ranking of your assets
- Baseline readings and alarm limits
- Quarterly trend reports
PRACTICE 03
Motor fleet survey
We walk your plant and build the motor inventory you wish you had: nameplate data, condition, criticality, and which units have a spare on the shelf.
- Complete nameplate database
- Spares gap list
- Standardization opportunities
PRACTICE 04
Repair-vs-replace policy
A written rule your team can apply without calling anyone. We compare repair cost, replacement cost, efficiency gains, and lead time, then set the threshold for each motor class.
- Repair-or-replace rules for each motor size and frame
- Energy payback calculations
- Obsolete-frame watch list
PRACTICE 05
Critical spares strategy
Decide which motors, gearboxes, bearings, and drives to stock, which to keep a repair slot for, and which can wait. Inventory sized to your downtime cost, not a guess.
- Downtime cost model
- Stock, pool, or order-on-fail
- Spare rotation and storage care
PRACTICE 06
Maintenance operations review
We look at how work moves through your maintenance team, from the call to the closed work order, and fix the steps where time and money leak out.
- Work order flow mapping
- Vendor repair specifications
- KPIs you can actually track